By Alice Waugh
If a community center is built on the Hartwell campus, more parking will be needed, but creating a new entrance from Lincoln Road on the south side of the site probably won’t be necessary, according to an interim report by the Campus Master Planning Committee consultants.
Because both a school project and a community center are being contemplated on the Ballfield Road campus, the CMPC was formed to study the basic infrastructure and physical layout of the campus and assess the capacity of the existing infrastructure (buildings, roadways, septic systems, etc.) to support future uses.